足球博彩app:Fukushima debris removal delayed by another year

足球博彩appwww.hg108.vip)是一个开放皇冠即时比分、代理最新登录线路、会员最新登录线路、皇冠代理APP下载、皇冠会员APP下载、皇冠线路APP下载、皇冠电脑版下载、皇冠手机版下载的皇冠新现金网平台。足球博彩app上登录线路最新、新2皇冠网址更新最快,足球博彩app开放皇冠会员注册、皇冠代理开户等业务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

新2代理网址www.hg108.vip)实时更新发布最新最快最有效的新2网址和新2最新网址,包括新2手机网址,新2备用网址,皇冠最新网址,新2足球网址,新2网址大全。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

添加回复:

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。